Company Activity

    Since its establishment in 1989 as ET “EL– Stefan Stefanov” until now, the company EL EOOD has implemented multiple projects within the territory of the country – low and medium voltage cable lines, subfeeders, low, medium and high voltage overhead power lines.

    EL EOOD has concluded a framework agreement with "E.ON Bulgaria Grids" AD and implements energy projects from their the investment and maintenance programme and joins new users of "E.ON Bulgaria Grids" AD since 2006 -on the territory of the district of Ruse, since 2008- on the territory of the Districts of Ruse, Razgrad and Silistra, and since 2009 - on the territory of the Districts of Ruse, Razgrad, Silistra, Dobrich, Targovishte, Shumen and Varna.

    For three years now EL EOOD has been implementing subscription maintenance of mobile stations for “Cosmo Bulgaria Mobile EAD”, located in the North- East area of Bulgaria.

    The company disposes of a large number if own transport vehicles and machinery, and uses them for mass excavations and all types of transport services.

    Some of the most significant sites EL EOOD has constructed in the last years in the field of power engineering – sites of "NEC" EAD and "ESO" EAD, high voltage 110ęV and up are as follow as:

in 2004

- Installation of a lightning protection rope, changing of insulation chains and repoverheading of overhead line 110 kV ”Dorostol”.

in 2005

- Reconstruction of overhead line 110 kV “Rusofili” from pole 21 to pole 23 – strengthening of pole 22;

- Installation of OPGW on overhead line 400 kV „Murgash” from pole 136 to portal of substation „Pleven”;

- Installation of lightning protection rope with optic fibres of the type OPGW of Power lines 400 kV “Madrets”.

in 2006

- Changing of conductors and lightning protection rope of overhead line 110 kV “Ostrets- Yavorets” from substation “Balkan” to pole 19;

- Repoverhead works on overhead power line 110 kV “Yastrebovo” form pole 112 to substation “Vetovo”;

- Installation of optic connection form substation “G. Oryahovitsa” to substation “Pleven 1”, by changing of the existing lightning protection rope of overhead line 220 ęV “VIT” with one with built-in optic fibres;

- Rehabilitation of overhead line 110 ęV “Orlovets” – part 2;

- Rehabilitation of overhead line 110kV „Avrora-Albatros”;

- Rehabilitation of overhead line 110kV „Orlovets” form substation „P.Trambesh” to pole ą33;

- Installation of optic connection by changing of lightning protection rope of overhead line 400 ęV „Otechestvo” with ones with built-in optic fibres”.

in 2007

- Changing of lightning protection rope and repair works on grounding facilities of overhead line 220 kV „Strelets”;

- Repairing of lightning protection rope by changing it with OPGW on overhead line 110 kV „Kalatsit”, ”Karmen”, ”Milin Kamak ”, ”Buchka” and „Chernila”.

in 2008

- Changing of lightning protection rope and repair works on grounding facilities of overhead line 110kV “Angel Kanchev”;

- Repair works on overhead line 220 ęV “Shipka” – changing of lightning protection ropes.

in 2009

- Changing of lighting protection rope, vertical earth wire and grounding facilities on overhead line 110 ęV „Cibar” from pole 1 to pole 66.